Project Nexus, announced in February 2022, is a proof-of-concept demonstration project funded by the State of California to test the installation of solar panel canopies over irrigation canals. The pilot project was facilitated by Solar AquaGrid in partnership with the California Department of Water Resources, Turlock Irrigation District, and the University of California, Merced. 

Project Nexus serves as a live testbed to pilot and study solar over canal design, deployment, and co-benefits on behalf of the State of California using TID land and grid access. Project construction and commissioning of the arrays was completed in 2026. The project was inspired by a 2021 University of California Merced study that revealed numerous water, energy, and economic co-benefits of covering California’s exposed canal system with solar panels.

“As the first public irrigation district in California, we aren't afraid to chart a new path with pilot projects that have potential to meet our water and energy sustainability goals."

– Michael Frantz, Board President, Turlock Irrigation District

Project Nexus Updates

Construction of Project Nexus and commissioning of wide-span and narrow-span arrays was completed in 2026. The University of California, Merced continues to collect data over multiple irrigation seasons with research equipment positioned at both site locations.

Governor Gavin Newsom announces Solar-Canal Projects Coming to California


Frequently Asked Questions

For more about the project, visit TID’s website at www.tid.org/projectnexus